The SIRSU project for the sterilization of hospital waste in Beira

09 April 2021

The SIRSU project aims to sterilize through the Newster machine the approximately 550 kg of waste produced daily by the hospital.

Normally an incinerator should be 150 m high, a height that allows dust to spread far and not cause damage to people or the surrounding area.

In Beira, the incinerator is 10 mt high, and is often in failure, the air filters can be considered non-existent.
The SIRSU project aims to sterilize through the Newster machine the approximately 550 kg of waste produced daily by the hospital and other peripheral health facilities (of which 15% is estimated to be infectious), aiming to improve air quality, the health of local residents and the natural conditions of the surrounding landscape.

Equally important will be the training of hospital staff in the proper separation of infectious waste from non-infectious waste, through collaboration with CAM (Consortium of Associations with Mozambique).

Newster System S.r.l.
Via Pascoli, 26/28
47853 Cerasolo di Coriano (RN)
Tel. +39 0541 759160
Fax +39 0541 759163
VAT NUMBER IT09269221009

Logo Footer

Newster System S.r.l. - Via Pascoli, 26/28 - 47853 Cerasolo di Coriano (RN) - Tel. +39 0541 759160 - Fax +39 0541 759163 - VAT NUMBER IT09269221009

Nur Digital Marketing Digital Marketing